The Dashboard

A tour of the Cashflow Manager dashboard — the project summary, mini cash flow chart, forecast actions, onboarding, and the settings menu.

The dashboard is your home screen — a one-glance view of the project's cash flow and the launch pad for everything else.

What's on it

Element What it shows / does
Mini cash flow chart A compact preview of projected costs, revenue, and net. Click to open the full view.
Summary metrics Total Costs, Total Revenue, and Margin % for the active forecasts.
Create / Update Cost Forecast Opens the forecasting editor for costs.
Create / Update Revenue Forecast Opens the editor for revenue (from your SOV).
Full Cash Flow Opens the detailed cash flow analysis view.
Refresh Reloads all data from Procore.
Settings (gear icon) Setup and configuration tools (below).

Onboarding stepper

On a new project, the dashboard shows an onboarding stepper that walks you through setup in order: choose a setup type, then map your SOV (or set exclusions for budget-only projects), then build revenue, then cost. It tracks your progress and steps aside once the project is set up.

Settings menu

The gear icon opens the configuration tools:

Setting Purpose
Budget Attribute Setup Sync the head contract's SOV items into Procore attributes (one-time) — see SOV revenue.
SOV Assignments Match budget lines to SOV items for revenue.
Import Schedule Upload a project schedule (MS Project file) — see Schedule integration.
Schedule Assignments Link budget lines to schedule tasks.
Data Diagnostics Developer tools for inspecting Procore data and troubleshooting.
Reset Project Clear all forecasts, schedules, and mappings for the project and start over.

Reset Project is destructive. It deletes every forecast, schedule source, and mapping for the current project. There's no undo — use it only when you genuinely want a clean slate.

Where to go next

FAQ

Why are some buttons labelled "Update" instead of "Create"?

The button reflects state. If a cost or revenue forecast already exists, the button updates it; if none exists yet, it creates one.

The numbers look stale — how do I refresh?

Use Refresh to reload everything from Procore. The dashboard caches the last load so it opens fast.

What's the onboarding stepper for?

It guides first-time setup for a project — choosing a setup type, mapping SOV or exclusions, then building revenue and cost. It disappears once setup is complete.